Well for drinking water extraction

Informazioni sul Progetto

Construction of a well for drinking water with an attached concrete tower containing a 6,000 liter tank, pump, filters, pipes and connection to the water network of the Joseph Millenium School

Finalità

Provide the extraction of drinking water

Risultati Attesi

Provide water supply to the school building allowing for suitable health and hygiene conditions



Leave a comment

Your email address will not be published.